UIP Factory: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
==History and Operations== | ==History and Operations== | ||
In 2022, the plans for a factory in northern [[Kekistan]] were announced. Originally construction began by {{user-nonwiki|Orknarok_666}} in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 {{user|aq2a}} was put in charge of the project, and continued construction. With an blank check from the [[UIP]], {{user|aq2a}} began construction of the vast complex. As of writing, the '''UIP Factory''' is still under construction, with a fully completed entrance, warehouse, as well as Sugarcane, and Cactus producing Facilities. | In 2022, the plans for a factory in northern [[Kekistan]] were announced. Originally construction began by {{user-nonwiki|Orknarok_666}} in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 {{user|aq2a}} was put in charge of the project, and continued construction. With an blank check from the [[UIP]], {{user|aq2a}} began construction of the vast complex, a process that lasted for about X months. | ||
The largest building, known as the [[UIP Warehouse]], serves as the 'hub' of the complex, containing the [[UIP]]'s store of materials. As of writing, the '''UIP Factory''' is still under construction, with a fully completed entrance, warehouse, as well as Sugarcane, and Cactus producing Facilities. |
Revision as of 22:48, 20 January 2024
The UIP Factory Is the industrial heart of the UIP. Located to the north of Kekistan, it stores the entirety of the UIP's stored resources and materials, as well as serves as the production facility for these materials. It currently employs approximately 2 players, and is the main source of work throughout the UIP. Designed and built by aq2a, along with the help and funding of Orknarok_666, CruxyMC, Jcheese7, and Noggisoggi, it is the largest structure on the server, and costing nearly $---,--- in materials and taking approximately 2 years to construct.
History and Operations
In 2022, the plans for a factory in northern Kekistan were announced. Originally construction began by Orknarok_666 in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 aq2a was put in charge of the project, and continued construction. With an blank check from the UIP, aq2a began construction of the vast complex, a process that lasted for about X months.
The largest building, known as the UIP Warehouse, serves as the 'hub' of the complex, containing the UIP's store of materials. As of writing, the UIP Factory is still under construction, with a fully completed entrance, warehouse, as well as Sugarcane, and Cactus producing Facilities.