UIP Factory: Difference between revisions

From RetroMC
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
   
   
==History and Operations==
==History and Operations==
In 2022, the plans for a factory in northern [[Kekistan]] were announced. Originally construction began by {{user-nonwiki|Orknarok_666}} in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 {{user|aq2a}} was put in charge of the project, and continued construction. As of writing, the '''UIP Factory''' is still under construction, with a fully completed entrance, warehouse, as well as Sugarcane, and Cactus producing Facilities.
In 2022, the plans for a factory in northern [[Kekistan]] were announced. Originally construction began by {{user-nonwiki|Orknarok_666}} in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 {{user|aq2a}} was put in charge of the project, and continued construction. With an blank check from the [[UIP]], {{user|aq2a}} began construction of the vast complex. As of writing, the '''UIP Factory''' is still under construction, with a fully completed entrance, warehouse, as well as Sugarcane, and Cactus producing Facilities.

Revision as of 22:45, 20 January 2024

The UIP Factory Is the industrial heart of the UIP. Located to the north of Kekistan, it stores the entirety of the UIP's stored resources and materials, as well as serves as the production facility for these materials. It currently employs approximately 2 players, and is the main source of work throughout the UIP. Designed and built by 16.png aq2a, along with the help and funding of 16.png Orknarok_666, 16.png CruxyMC, 16.png Jcheese7, and 16.png Noggisoggi, it is the largest structure on the server, and costing nearly $---,--- in materials and taking approximately 2 years to construct.

History and Operations

In 2022, the plans for a factory in northern Kekistan were announced. Originally construction began by 16.png Orknarok_666 in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 16.png aq2a was put in charge of the project, and continued construction. With an blank check from the UIP, 16.png aq2a began construction of the vast complex. As of writing, the UIP Factory is still under construction, with a fully completed entrance, warehouse, as well as Sugarcane, and Cactus producing Facilities.