The '''UIP Factory''' Is the industrial heart of the [[UIP]]. Located to the north of [[Kekistan]], it stores the entirety of the [[UIP]]'s stored resources and materials, as well as serves as the production facility for these materials. It currently employs approximately 2 players, and is the main source of work throughout the [[UIP]]. Designed and built by [[Coastwood Construction Corporation]], it is the largest structure on the server, and costing nearly $---,--- in materials and taking approximately 2 years to construct.
The '''UIP Factory''' Is the industrial heart of the [[UIP]]. Located to the north of [[Kekistan]], it stores the entirety of the [[UIP]]'s stored resources and materials, as well as serves as the production facility for these materials. It currently employs approximately 2 players, and is the main source of work throughout the [[UIP]]. Designed and built by [[Coastwood Construction Corporation]], it is the largest structure on the server, and costing nearly $---,--- in materials and taking approximately 2 years to construct.
   
   

Revision as of 00:29, 2 April 2024

The UIP Factory Is the industrial heart of the UIP. Located to the north of Kekistan, it stores the entirety of the UIP's stored resources and materials, as well as serves as the production facility for these materials. It currently employs approximately 2 players, and is the main source of work throughout the UIP. Designed and built by Coastwood Construction Corporation, it is the largest structure on the server, and costing nearly $---,--- in materials and taking approximately 2 years to construct.

History and Operations

In 2022, the plans for a factory in northern Kekistan were announced. Originally construction began by 16.png Orknarok_666 in November 2022. He laid out the framework, on which the future factory would be built including the worker transit system, and maintenance tunnels. In mid 2023 16.png aq2a was put in charge of the project, and continued construction. With an blank check from the UIP, 16.png aq2a began construction of the vast complex, a process that lasted for about X months.